Skip to Content

Solve pollution. Save lives.
Protect the planet.

Bremang Lead Remediation Project

Bremang Lead Remediation Project

Project Overview

Active
Country
Ghana
Pollutant(s)
Lead
Date
2025-2025
Partner(s)

Suame Municipal Assembly

Environmental Protection Authority

Core Activities
Advocacy & Awareness, Source-Specific Intervention
Industry
Battery Recycling, Smelting
Source
Used Lead Acid Batteries (ULABs)
Bremang Lead Remediation Project

The project aims to mitigate the risk of heavy metal exposure among children due to lead pollution at the Bremang site in Kumasi, Ghana. Once a center for used lead-acid battery and scrap metal smelting, the site now poses significant health and environmental risks due to high concentrations of lead in the soil, affecting approximately 6000 m² of land. The contamination particularly endangers local children, whose health is most vulnerable to lead poisoning.

Led by the Suame District Assembly with support from Pure Earth, this project aims to mitigate lead exposure through a comprehensive soil capping intervention, alongside extensive community engagement and educational initiatives. The remediation strategy will involve clearing and excavating the contaminated soil, disposed in a proper way, and applying and installing a clean soil cap to prevent further exposure. These efforts will be complemented by targeted community education campaigns designed to raise awareness about the risks of lead poisoning and promote preventive health measures.

The project aligns with Suame Assembly District priorities and Pure Earth’s mission to address legacy pollution and its impacts on human health, offering a sustainable and replicable model for similar environmental challenges in Ghana and beyond.

Project Timeline

The project is planned to be implemented over a span of 3 months, including all preparatory, execution, and monitoring phases. Find below the detailed timelines with specific milestones to ensure effective project management and delivery.

Project Goal, Objectives, Activities and Outcomes
Project goal: To protect public health by reducing lead exposure in the Bremang community.

Objective 1: To enhance the expertise and capabilities of Suame District Assembly, including the Environmental Protection Agency (EPA) in implementing effective lead risk mitigation measures. The project objective aims to build and strengthen the knowledge and skills of local government agencies, notably the Environmental Protection Agency (EPA) and the Suame District Assembly’s environmental inspectors, to effectively manage and mitigate lead risks. There will be a one-day capacity-building initiative and practical demonstrations of the remediation and post remediation methodology. This project objective seeks to equip these agencies with the latest methodologies, tools, and best practices for assessing and addressing lead contamination.

Expected Outcome 

The project objective involves conducting a thorough evaluation of the remediation efforts undertaken at the Bremang site to ensure that lead contamination has been effectively mitigated. The evaluation will include a comprehensive post-remediation assessment, which will involve collecting and analyzing soil, water, and environmental data to confirm that contamination levels have been reduced to safe thresholds.

The findings from this assessment will be systematically documented in a detailed report. This report will outline the outcomes of the remediation efforts, highlight any residual risks, and provide recommendations for future monitoring and maintenance to sustain the safety and health of the community and environment. This activity not only verifies the success of the interventions but also serves as a critical source of information for continuous improvement and accountability in environmental management.

Last Updated: 04/22/25
Return to Content